Client: Confidential
Location: Essex
Sector: Import / Retail Supply / Distribution
Instruction: Monitoring a new build warehouse being constructed for the end-user
Contact: Ian Simmonds
Brief: ProMission was appointed at the commencement of the project to deal with the technical specification and monitoring construction. We were appointed before the building was designed and as such we were able to ensure important elements needed for the Tenant’s fit out were incorporated into the base build design, where these would have been expensive or extremely difficult to alter at a later stage. This included elements such as drainage in the right locations inside the warehouse and office, a reconfigured office core / WC layout, substantial motorised louvres in the elevations and an enhanced power supply.
Our role included:
ProMission has been retained to organise the Cat B office fit out works in 2021.